There is light at the end of the tunnel. If we can button up a few loose ends, the trails will reopen very soon.

Time:
8:00 am Sunday 10-16-16

Where:
East Side Trail Head. Latitude: 30.546380 Longitude: -95.583581 


Work required: 
Replace broken concrete blocks at two low grade crossings.

Clean debris off bridges and cut foliage away from bridges. 

Bring lunch,water, loppers and a shovel plus your PPE. ATVs will be very useful if you have one. Bikes are allowed but only for transport to work site. - we do not have clearance to just go riding.